  • Installation of a high-efficiency pump
  • Installation and switching on of media counters
  • Distribution of heating circuits (Building 3, 13)
  • Extension of energy management (electricity)
  • Reorganisation of campus electricity supply (decommissioning of transformer stations) and medium voltage connections
  • Installation of presence detector controls and LED lighting (C01)
  • Optimisation of ventilation systems
  • Separation of the ventilation system at the media dome from the main plant
  • Campus-wide notification of the energy certificate according to the German Energy Saving Regulations (ENEV)
  • Installation of presence detector controls in hallways and restrooms (Building 3, 5, 12, 13)
  • Exchange of fan motors with EC motors
  • Replacement of thermostatic valves and hydraulic balancing (building 8, 12 and 13)
  • Installation of the individual room control system en:key in C04
  • Dismantling of hot water supply in the sanitary facilities in Building C03
  • Replacement of exterior lighting with LEDs at Campus Kiel
  • Replacement of hallway lighting with LEDs in Building C13
  • Installation of a 9.15 kWp photovoltaic system in Building C13
  • Replacement of windows in Building C13
  • Installation of a 4.5 kWp wind turbine with in Building C13 (2020)